Tuesday, February 12, 2008

Fuses

Main Junction Box Nr.3 panel...

Todays work, the MJB No.3 panel is finished. 57 circuit breakers, one switch and 119 screws, everything cleaned and polished, taken apart and rebuilt. It was an easy work but it needed much time and patience...

Saturday, February 09, 2008

Bending wood

Two more parts...

Today I installed the instrument rack and the Master Junction Box sidepanel. The instrument rack is still hanging on some cords, it will be installed correctly later. First I have to cut away a bit of the wooden frame on the right side. That's because my cockpit is a bit narrower than the original, so I have to cheat a bit.... at the end all this will be covered and invisible. ;-)